Free Delivery
Doorstep Delivery
Get it by Wed, 20 May
to
EC1A 7ES

Base Required

Door Lock Included

Floor Included

Warranty Included
What's Included?
Not Included:
Features

Earn {RICH_TEXT_POTENTIAL_REWARDS} in rewards today, plus free standard delivery² on future purchases & more after you join.
£60/mo. at 0% APR for 12 mos.
Rated 1 out of 5 stars
Showing 1-2 of 2 reviews
Rated 1 out of 5 stars
I bought this product to save myself time in having to build one. Huge mistake!!! The shed arrived damaged for starters, it had also not been put together properly, with nails sticking out here and there, and then on further inspection I saw that the shed is the most flimsy thing you would never want to put even your lawnmower in. The frame is built from 25mm x 40mm timber which wouldn't keep out my dog if he decided to charge at it! There are no supports to the floor which is made from 10mm thick chipboard, meaning there is a good chance that it will definitely at least bounce, and probably break completely if you dropped anything heavy on it. The roof is made of the same 10mm thick chipboard with no supports again. Climbing on this roof would be very dangerous therefore I'm not sure how anyone is supposed to felt it as it isn't felted. The entire shed is an accident waiting to happen!!!
Rated 1 out of 5 stars
Total rubbish. 1 shiplap board had a massive gouge on the inside that they attempted to fill with epoxy resin and sawdust. Problem was it didn't set hard, and I just dug it out with my finger. Then found it had gone right through to the front face. Had to decide whether to send the whole thing back or correct it by buying a new board from the well known DIY place W-----. Chose to fix it myself. Also, can I suggest Empire give their workers spectacles, so that they can cut the boards level with the frames. Another job I will need to put right or the shed won't fit together properly. I know it's only a shed, but it is supposed to be a quality shed. I suppose it depends on what level of quality your looking at. I rate the quality as poor. But if I can make it better why oh why can't Empire. The roofing felt supplied is going to the recycle centre as it's so thin it'll rip to shreds in the first bit of wind we get. Extra £30 to pay out to get some decent green mineral felt.